F.A.S. 2583 Over LaMoine River

Located in Springfield, IL
217-793-8844
Located in Springfield, IL
Call Us Today
  • Slide title

    Proposed Structure

    Button
  • Slide title

    Existing Structure

    Button
  • Slide title

    Existing Structure

    Button
  • Slide title

    Proposed Structure

    Button

F.A.S. 2583 Over LaMoine River

Schuyler County, Illinois


Greene & Bradford, Inc. provided Phase I, II service to Schuyler County Highway Department preparing plans for Structural Rehabilitation of existing three-span precast prestressed concrete PPC deck beams bridge. The work includes complete replacement of existing 8- 33”x36” Precast Prestressed Concrete PPC deck beams and replacement of bridge railings and posts. The work also includes performing Bridge Condition Reports, Hydraulics study and preparing Preliminary Bridge Hydraulic report and Contract Documents.

PROJECT DETAILS:


Client:

Schuyler County Highway Department


Services Provided:

Structural Engineering

Surveying

Drainage & Hydraulics

Roadway Design


Size:

46.34-FT


Construction Cost:

$118,313


Construction Schedule:

November 2020



 

Share by: