TR303 Over Lake Fork

Located in Springfield, IL
217-793-8844
Located in Springfield, IL
Call Us Today
  • Slide title

    Structure prior to replacement

    Button
  • Slide title

    Structure prior to replacement

    Button
  • Slide title

    Underside of structure prior to replacement

    Button
  • Slide title

    Proposed Structure

    Button

TR 303 Over Lake Fork

Pana, Christian County, Illinois


Greene & Bradford, Inc. provided Phase I, II engineering services to Christian County DOT preparing plans for structural replacement of existing one-span 26'-0" steel stringer bridge S.N.011-3242 carrying TR 303 over Lake Fork in Pana, IL. The scope of work included complete replacement of existing structure with new structure S.N. 011-3384 Three-Sided Precast Culvert 26' x 11'-4" with the cast in place wing-walls and pile foundation, about 800-ft of improvements to the roadway work and other essentials to complete the section. The work also includes performing hydraulics study, preparing Preliminary Bridge Hydraulic report and Contract Documents for the proposed structure.

PROJECT DETAILS:


Client:

Christian County Highway Department


Services Provided:

Structural Engineering

Surveying

Roadway Design

Drainage & Hydraulics


Size:

800-FT


Construction Cost:

$350,800


Construction Schedule:

2021



 

Share by: